We design and build custom pools, spas, patios, and outdoor living spaces for homeowners throughout Fresno, Clovis, Visalia, Tulare, Bakersfield, and communities across California’s Central Valley.
Each project begins with a quiet conversation: how you entertain, how the light falls in late afternoon, the materials that make you pause. From there, our designers and master craftsmen sculpt a pool and outdoor environment that feels inevitable — as if it had always been there.
Proudly building pools across California's Central Valley.
From Fresno and Clovis to Visalia, Bakersfield, Hanford, Tulare and surrounding communities, we help Central Valley homeowners create beautiful outdoor spaces designed for the way they live.
Most New Creation Pools are built in 4 to 6 weeks and Pool Spas are built in 6 to 8 weeks. This also depends on weather and timely material selections.
02 How much damage will be done to the existing yard during construction?
This really depends on your yard. If you have a new home with no backyard landscape it’s very minimal. If during excavation we need to drive over existing landscape to access the pool area or dig the pool in an area that has existing grass or sprinklers, the repairs could be extensive. Most irrigation and drain lines must be relocated or repaired. We help identify those lines and possibly can complete minor drain line repairs but other repairs are not included in the contract as we have no idea what the extent of additional work would be.
03 I see the drawing but where will the pool actually be?
New Creation Pools is the only local Pool Builder that will layout the pool before the dig. The pool layout will be painted prior to the dig and reference pins will be installed which allows the digger to complete their work in 1 day. Some larger pools or pools with limited access require 2 days to dig the pool but this is rare.
04 Where do I select my tile and other decorative features?
Tile can be selected from SCP, located at 7337 West Goshen Ave, Visalia, CA 93291. The stone has not yet been selected. Colored Quartz and Pebble plaster finishes will also need to be chosen. SCP offers samples of Fusion Pebble and Sparkle Quartz to assist with the selection process. It is recommended to finalize all material selections as soon as possible to help avoid potential construction delays.
05 How long will my fence be down to access the backyard?
We typically remove fencing the day before the dig. Once the dig is complete, we secure the fencing although depending on access we will use that same access for plumbing rebar, gunite and concrete.
06 What is the payment schedule?
The Contractors State Licensing Board allows a contractor to collect $1,000.00 or 10% of the contracted amount whichever is less when the contract is signed. Payments for the remainder of the contract are billed as said work is completed. For example, a typical payment at pool dig is $8,000.00. Any amount billed above that amount would be excessive and illegal. Other payments are typically due at Gunite, Concrete and Plaster completion. Most pool projects have 5 payments as work is completed. Pool lenders will pay the contractor direct and there are usually 4 payments and no down payment if the entire contract amount is financed.
07 Why is the bottom step not shaped with rebar?
The Bottom step is formed up when the gunite is placed.
08 How do they get the gunite, concrete and plaster to my backyard?
Gunite, concrete and plaster are pumped to the rear yard through a hose. Both the pump for concrete and the compressor for gunite are very loud so please inform your neighbors before that work is done. Usually the street in front of your house needs to be available for these trucks and the driveway could be blocked.